Title | | Add | Added |
Evergreen Health - Geriatric Care and ENT Clinic renovations, King County, WA; due May 30 @ 1 pm |
|
prebid sign-in |
05/17 |
F Lot electrical service upgrades, Olympia, WA; due May 29 @ 2 pm |
|
addendum 2 |
05/17 |
Fire and domestic water pump renovation, Olympia, WA; due May 23 @ 2 pm |
|
prebid q&a |
05/17 |
HVAC, Phase 2, Ag Science, University of Idaho, Moscow, ID; due May 23 @ 2 pm |
|
addendum 5 |
05/17 |
Reservoir 3 replacement, Phase 1, Everett, WA; due May 21 @ 2 pm |
|
prebid sign-in |
05/17 |
Sterling Pines renovation, Tumwater, WA; due May 29 @ 3 pm |
|
addendum 1 |
05/17 |
Landscape and irrigation for the Leschi Spirit House, Thurston County, WA; due May 23 @ 2 pm |
|
addendum 1 |
05/17 |
Renovation for I-Grad program, Kent, WA; due May 23 @ 2 pm |
|
addendum 3 |
05/17 |
Meridian sewer main, I-5 to Van Wyck (EU184), Bellingham, WA; due May 29 @ 11 am |
|
addendum 2 |
05/17 |
50th Avenue roundabout and Pioneer Street widening, Ridgefield, WA; due May 30 @ 4 pm |
|
addendum 2 |
05/17 |
430 Water transmission pipeline reline - Phase 2, Seattle, WA; due May 22 @ 2 pm |
|
qa 7 |
05/17 |
Puyallup Library teen zone remodel, Puyallup, WA; due May 21 @ 2 pm |
|
addendum 1 |
05/17 |
Kentridge D-Wing Art remodel, Kent, WA; due May 22 @ 2 pm |
|
addendum 3 |
05/17 |
Renovation for I-Grad program, Kent, WA; due May 23 @ 2 pm |
|
addendum 2 |
05/17 |
Maple Street sidewalk infill, Scappoose, OR; due May 24 @ 2 pm |
|
addendum 2 |
05/17 |
RapidRide J Line bus rapid transit - Rebid, Seattle, WA; due Jun 5 @ 2 pm |
|
qa 1 |
05/17 |
2024 Stormwater cured-in-place-pipe rehabilitation in various Tacoma locations, Tacoma, WA; due May 28 @ 11 am Changed from May 21 @ 11 am |
|
addendum 1 |
05/17 |
430 Water transmission pipeline reline - Phase 2, Seattle, WA; due May 22 @ 2 pm |
|
addendum 6 |
05/17 |
Solid waste truck scale replacement, Ketchikan, AK; due May 23 @ 10 am |
|
addendum 1 |
05/17 |
Chennault Beach Drive drainage improvements, Mukilteo, WA; due May 30 @ 2 pm |
|
addendum 2 |
05/17 |
Evergreen Health - Geriatric Care and ENT Clinic renovations, King County, WA; due May 30 @ 1 pm |
|
addendum 1 |
05/17 |
Marvin Road upgrade - Phase 1 (22nd Avenue to Union Mills Road), Thurston County, WA; due May 30 @ 10:30 am |
|
addendum 2 |
05/17 |
Reservoir 3 replacement, Phase 1, Everett, WA; due May 21 @ 2 pm |
|
addendum 5 |
05/17 |
Algona Wetland Preserve restoration and interpretive trail, Algona, WA; due May 20 @ 10 am |
|
addendum 3 |
05/17 |
Raab Park play for all, Poulsbo, WA; due May 28 @ 11 am |
|
addendum 2 |
05/17 |
Port warehouses roofing improvements, Anacortes, WA; due May 22 @ 10 am |
|
addendum 1 |
05/17 |
Public Safety Building 14 (Fire Protection Way) seismic retrofit, Salem, OR; due Jun 5 @ 1 pm |
|
addendum 1 |
05/17 |
Public Safety Building 14 (Fire Protection Way) seismic retrofit, Salem, OR; due Jun 5 @ 1 pm |
|
addendum 2 |
05/17 |
US 395, Hatch Road to Hamilton Road paving, Spokane County, WA; due Jun 5 @ 11 am |
|
qa 1 |
05/17 |
Winkenwerder Hall second floor cooling, Seattle, WA; due Jun 4 @ 3 pm |
|
addendum 1 |
05/17 |
Richland waste gas burner and boiler replacement, Richland, WA; due May 21 @ 2:30 pm |
|
addendum 2 |
05/17 |
Seattle Pier 15.5 coatings, Seattle, WA; due May 30 @ 3 pm |
|
addendum 3 |
05/17 |
Parking lot maintenance and repairs, Ellensburg, WA; due May 30 @ 2 pm |
|
addendum 1 |
05/17 |
Pavilion re-roof and miscellaneous envelope repairs - Rebid, Lewiston, ID; due May 22 @ 10 am |
|
addendum 2 |
05/17 |
Farm 3 and 4 winter storage lagoons, Morrow County, OR; due May 30 @ 2 pm |
|
addendum 4 |
05/17 |
Main Jail third and fourth floor painting, Tacoma, WA; due May 22 @ 1 pm |
|
addendum 4 |
05/17 |
Building 17 over-roof, Tacoma, WA; due May 23 @ 1 pm |
|
addendum 2 |
05/17 |
Building 17 over-roof, Tacoma, WA; due May 23 @ 1 pm |
|
addendum 1 |
05/17 |
Wellpinit Boys and Girls Club remodel, Wellpinit, WA; due May 21 @ 2 pm |
|
addendum 5 |
05/17 |
I-5: Kuebler Boulevard to Delaney Road widening section of the Pacific Highway, Salem, OR; due May 23 @ 9 am |
|
addendum 3 |
05/17 |
Berryman Park improvements, Bridgeport, WA; due May 21 @ 11 am |
|
addendum 1 |
05/17 |
Firwood Gym and fire station demolition, Fife, WA; due May 23 @ 10 am |
|
addendum 2 |
05/17 |
North Willamette Street, East Macy Street, and North Harrison Street reconstruction, Coburg, OR; due May 22 @ 2 pm |
|
addendum 3 |
05/17 |
I-5 & SR 539, Baker Creek and Spring Creek - Fish passage design-build, Whatcom County, WA; due May 22 @ 11 am |
|
addendum 2 |
05/17 |
I-5 & SR 539, Baker Creek and Spring Creek - Fish passage design-build, Whatcom County, WA; due May 22 @ 11 am |
|
qa 2 |
05/17 |
SR 26 and I-90, Eastern Region 2024 bridge repair, Adams County, WA; due May 22 @ 11 am |
|
qa 3 |
05/17 |
Hinsdale lab additions construction services, Corvallis, OR; due May 23 @ 2 pm Changed from May 21 @ 2 pm |
|
addendum 3 |
05/17 |
Ridgefield treatment plant secondary treatment process improvements, Ridgefield, WA; due May 30 @ 10 am Changed from May 21 @ 10 am |
|
addendum 2 |
05/16 |
Main Jail third and fourth floor painting, Tacoma, WA; due May 22 @ 1 pm |
|
addendum 3 |
05/16 |
Nelson Facility CNG fuel system expansion Phases 2, 3 and 4 , Spokane, WA; due Jun 3 @ 1 pm |
|
addendum 1 |
05/16 |
Northeast 92nd Street utility improvements, Seattle, WA; due Jun 5 @ 2 pm |
|
prebid sign-in 1 revised |
05/16 |
Northeast 92nd Street utility improvements, Seattle, WA; due Jun 5 @ 2 pm |
|
prebid meeting minutes |
05/16 |
Northeast 92nd Street utility improvements, Seattle, WA; due Jun 5 @ 2 pm |
|
prebid sign-in 1 |
05/16 |
Northeast 92nd Street utility improvements, Seattle, WA; due Jun 5 @ 2 pm |
|
prebid sign-in 2 |
05/16 |
Building 32, US Mower paving, Skagit County, WA; due May 30 @ 2:30 pm |
|
addendum 2 |
05/16 |
Willow Living Unit outdoor recreation roof, ; due May 21 @ 1 pm |
|
addendum 2 |
05/16 |
Ray Williamson Pool improvements, Phase 1, Bainbridge Island, WA; due May 21 @ 2 pm |
|
addendum 2 |
05/16 |
Irrigation central pumping station and main line, south campus, Boise State University, Boise, ID; due May 23 @ 2 pm |
|
addendum 3 |
05/16 |
Millwood Estates - Landscape irrigation - Phase 2, Lynnwood, WA; due May 22 @ 12 pm |
|
addendum 1 |
05/16 |
Performing arts center renovation, Mukilteo, WA; due May 21 @ 2 pm |
|
addendum 3 |
05/16 |
MV Tokitae drydocking, ; due May 30 @ 11 am |
|
q&a 6-7 |
05/16 |
MV Tokitae drydocking, ; due May 30 @ 11 am |
|
ifb schedule revision |
05/16 |
MV Tokitae drydocking, ; due May 30 @ 11 am Changed from May 21 @ 11 am |
|
addendum 5 |
05/16 |
Job order contracting firms, King County, WA; due May 20 @ 2 pm |
|
addendum 2 |
05/16 |
Algona Wetland Preserve restoration and interpretive trail, Algona, WA; due May 20 @ 10 am |
|
addendum 2 |
05/16 |
Eighth Street paving - Lincoln to A Street, Port Angeles, WA; due May 23 @ 2 pm |
|
addendum 2 |
05/16 |
2024 Pavement overlays, Sammamish, WA; due May 16 @ 11 am |
|
addendum 2 - revised |
05/16 |
Spencer Creek Building 7802, Kalama, WA; due Jun 4 @ 10 am |
|
prebid sign-in |
05/16 |
430 Water transmission pipeline reline - Phase 2, Seattle, WA; due May 22 @ 2 pm |
|
qa 6 |
05/16 |
430 Water transmission pipeline reline - Phase 2, Seattle, WA; due May 22 @ 2 pm |
|
qa 5 |
05/16 |
Science lab alterations, Pasco, WA; due May 22 @ 1 pm |
|
addendum 2 |
05/16 |
2024 Komachin Middle School parking lot improvements, Lacey, WA; due May 29 @ 2 pm |
|
addendum 1 |
05/16 |
Wastewater treatment plant (WWTP) Phase I improvements, Scappoose, OR; due May 23 @ 2 pm |
|
addendum 4 |
05/16 |
Well 20 pump replacement, cleanout, and redevelopment, Port Orchard, WA; due Jun 4 @ 9 am |
|
addendum 1 |
05/16 |
North Willamette Street, East Macy Street, and North Harrison Street reconstruction, Coburg, OR; due May 22 @ 2 pm |
|
addendum 2 |
05/16 |
Bellingham cruise terminal pier repair Phase II - Rebid, Bellingham, WA; due May 21 @ 11 am |
|
addendum 3 |
05/16 |
2024 Pavement overlays, Sammamish, WA; due May 16 @ 11 am Changed from May 15 @ 4 pm |
|
addendum 2 |
05/15 |
Sultan River side channel 1 extension, Sultan, WA; due May 16 @ 2 pm |
|
qa 1 revised |
05/15 |
Reconstruct apron - Southwest Oregon Regional Airport, North Bend, OR; due May 21 @ 2 pm |
|
addendum 1 |
05/15 |
Sultan River side channel 1 extension, Sultan, WA; due May 16 @ 2 pm |
|
qa 1 |
05/15 |
North Schmeer Road east of Whitaker Road, Portland, OR; due Jun 4 @ 2 pm |
|
addendum 1 |
05/15 |
Lift Station No. 5 design retrofit, Tukwila, WA; due May 16 @ 9:30 am |
|
addendum 1 document |
05/15 |
Station 53, Silverdale, WA; due Jun 12 @ 11 am |
|
addendum 1 |
05/15 |
65th Campus public works enhancement, Vancouver, WA; due May 28 @ 3 pm Changed from May 14 @ 3 pm |
|
addendum 12 |
05/15 |
2024-2025 Potholing and utility locating, Various Locations, WA; due Jun 4 @ 10 am |
|
addendum 1 |
05/15 |
Wellpinit Boys and Girls Club remodel, Wellpinit, WA; due May 21 @ 2 pm |
|
addendum 4 |
05/15 |
Harrisburg north and south water treatment plants, Harrisburg, OR; due Jun 13 @ 2 pm |
|
addendum 1 |
05/15 |
Pleasant Valley Primary three additional classrooms - New construction, Battle Ground, WA; due May 16 @ 2 pm |
|
addendum 4 |
05/15 |
Perimeter fencing improvements, Arlington, WA; due May 24 @ 10 am |
|
addendum 1 |
05/15 |
Fire and domestic water pump renovation, Olympia, WA; due May 23 @ 2 pm |
|
prebid sign-in |
05/15 |
2024 Capital improvement - Marine Drive and Soundview Drive water main, Stanwood, WA; due May 21 @ 2 pm |
|
qa 1 |
05/15 |
Maintenance building expansion, Spokane County, WA; due May 23 @ 4 pm Changed from May 21 @ 4 pm |
|
addendum 2 |
05/15 |
Linda Avenue and Ninth Street overlay, Gold Bar, WA; due May 23 @ 1 pm |
|
addendum 1 |
05/15 |
Postmark Center for the Arts - Basement renovation, Auburn, WA; due May 30 @ 11 am Changed from May 16 @ 11 am |
|
addendum 1 |
05/15 |
WHC - Heiner curtain wall repairs, Whatcom County, WA; due May 21 @ 1 pm |
|
addendum 1 |
05/15 |
Sultan River side channel 1 extension, Sultan, WA; due May 16 @ 2 pm |
|
prebid sign-in |
05/15 |
M Street Northeast and Columbia Way improvements Phase 1 - Railroad crossing at Columbia Way, Quincy, WA; due May 16 @ 10 am |
|
addendum 2 |
05/15 |
Northeast Quimby Avenue water main replacement, Bend, OR; due May 22 @ 2 pm |
|
addendum 1 |
05/15 |
Northeast Quimby Avenue water main replacement, Bend, OR; due May 22 @ 2 pm |
|
meeting list |
05/15 |
Talbot Hill Elementary fields and grounds upgrades, Renton, WA; due May 22 @ 2 pm |
|
addendum 1 |
05/15 |
Meridian sewer main, I-5 to Van Wyck (EU184), Bellingham, WA; due May 29 @ 11 am Changed from May 22 @ 11 am |
|
addendum 1 |
05/15 |
I-5: Kuebler Boulevard to Delaney Road widening section of the Pacific Highway, Salem, OR; due May 23 @ 9 am |
|
addendum 2 |
05/15 |
Juneau Douglas Treatment Plant vactor receiving station, Juneau, AK; due May 29 @ 3 pm |
|
information to bidders 1 |
05/15 |
Captains Bay Road waterline, Unalaska, AK; due May 30 @ 2 pm |
|
addendum 1 |
05/15 |
AVTEC Industrial Electronics Building renovations, Seward, AK; due May 29 @ 2 pm |
|
notice to bidders 1 |
05/15 |
Mechanical and electrical work at The BLVD Apartments, Kent, WA; due May 28 @ 4 pm |
|
addendum 1 |
05/15 |
129th Avenue and King Road roundabout, Happy Valley, OR; due May 23 @ 2 pm |
|
addendum 1 |
05/15 |
Hinsdale lab additions construction services, Corvallis, OR; due May 23 @ 2 pm |
|
addendum 2 |
05/15 |
Tigard-Tualatin School District (TTSD) HVAC equipment replacement, Washington County, OR; due May 30 @ 2 pm Changed from May 16 @ 2 pm |
|
addendum 3 |
05/15 |
Annex and Law and Justice Building commercial painting, Coupeville, WA; due May 15 @ 3 pm |
|
addendum 1 |
05/15 |
Burner and boiler controls upgrade - Riverside Park Water Reclamation Facility, Spokane, WA; due May 28 @ 1 pm |
|
addendum 1 |
05/14 |
2024 Stormwater cured-in-place-pipe rehabilitation in various Tacoma locations, Tacoma, WA; due May 28 @ 11 am |
|
qa 1 |
05/14 |
Pleasant Valley Primary three additional classrooms - New construction, Battle Ground, WA; due May 16 @ 2 pm |
|
addendum 3 |
05/14 |
2024 Otta seal, Mabton, WA; due May 15 @ 11 am |
|
addendum 1 |
05/14 |
2024 Otta seal, Mabton, WA; due May 15 @ 11 am |
|
addendum 2 |
05/14 |
Northeast Eighth Street and I-405 crossing improvements and beautification, Bellevue, WA; due May 16 @ 11 am |
|
addendum 1 |
05/14 |
Northeast Eighth Street and I-405 crossing improvements and beautification, Bellevue, WA; due May 16 @ 11 am |
|
qa 1 |
05/14 |
M Street Northeast and Columbia Way improvements Phase 1 - Railroad crossing at Columbia Way, Quincy, WA; due May 16 @ 10 am |
|
addendum 1 |
05/14 |
Chennault Beach Drive drainage improvements, Mukilteo, WA; due May 30 @ 2 pm |
|
addendum 1 |
05/14 |
Marvin Road upgrade - Phase 1 (22nd Avenue to Union Mills Road), Thurston County, WA; due May 30 @ 10:30 am Changed from May 23 @ 10 am |
|
addendum 1 |
05/14 |
Reservoir 3 replacement, Phase 1, Everett, WA; due May 21 @ 2 pm |
|
addendum 4 |
05/14 |
MV Tokitae drydocking, ; due May 30 @ 11 am |
|
q&a 3-5 |
05/14 |
MV Tokitae drydocking, ; due May 30 @ 11 am |
|
addendum 4 |
05/14 |
Thompson Creek Road Southeast at Thompson Creek fish passage, Thurston County, WA; due May 16 @ 9 am |
|
addendum 1 |
05/14 |
Eighth Street paving - Lincoln to A Street, Port Angeles, WA; due May 23 @ 2 pm |
|
addendum 1 |
05/14 |
2024 Seal coat, Gold Bar, WA; due May 16 @ 1 pm |
|
addendum 1 |
05/14 |
2024 Arterial preservation, Auburn, WA; due May 16 @ 11 am |
|
addendum 1 |
05/14 |
2024 Citywide Otta seal, Raymond, WA; due May 16 @ 10 am |
|
addendum 6 |
05/14 |
2024 Pavement overlays, Sammamish, WA; due May 16 @ 11 am |
|
revised specs |
05/14 |
2024 Pavement overlays, Sammamish, WA; due May 16 @ 11 am |
|
addendum 1 - revised |
05/14 |
2024 Sidewalk gaps, North Bend, WA; due May 15 @ 11 am |
|
addendum 1 |
05/14 |
I-5: Kuebler Boulevard to Delaney Road widening section of the Pacific Highway, Salem, OR; due May 23 @ 9 am |
|
clarification 2 |
05/14 |
Nisqually State Park - New full service park: Phase 2, Pierce County, WA; due May 16 @ 1 pm |
|
addendum 3 |
05/14 |
Kittitas County Correctional Facility and north parking lot charging station, Ellensburg, WA; due May 23 @ 11 am |
|
addendum 1 |
05/14 |
Nevada Drive force main replacement, Cowlitz County, WA; due May 16 @ 10 am Changed from May 14 @ 10 am |
|
addendum 2 |
05/14 |
Pleasant Valley Primary three additional classrooms - New construction, Battle Ground, WA; due May 16 @ 2 pm |
|
addendum 2 |
05/14 |
Taxiway A extension, Roseburg, WA; due May 16 @ 2 pm |
|
addendum 2 |
05/14 |
Quincy Square, Bremerton, WA; due May 16 @ 11:30 am |
|
addendum 1 document |
05/14 |
Apartment sound insulation, King County, WA; due Jun 6 @ 2 pm |
|
addendum 2 |
05/14 |
Apartment sound insulation, King County, WA; due Jun 6 @ 2 pm |
|
qa 3 |
05/14 |
SR 26 and I-90, Eastern Region 2024 bridge repair, Adams County, WA; due May 22 @ 11 am |
|
qa 2 |
05/14 |
SR 26 and I-90, Eastern Region 2024 bridge repair, Adams County, WA; due May 22 @ 11 am |
|
addendum 1 |
05/14 |
Northern Region ADA improvements - Fairbanks: Fourth and 11th avenues, Fairbanks, AK; due May 21 @ 2 pm |
|
addendum 1 |
05/14 |
Seattle Pier 15.5 coatings, Seattle, WA; due May 30 @ 3 pm Changed from May 17 @ 3 pm |
|
addendum 2 |
05/14 |
42nd Avenue upgrade - Phase 1 Lake Otis Parkway to Pipe Street, Anchorage, AK; due May 17 @ 2 pm |
|
prebid sign in |
05/14 |
District-wide renovations - CM/GC services, Curry County, OR; due May 16 @ 2 pm |
|
addendum 3 |
05/14 |
WSF, Maritime security infrastructure preservation, King, Kitsap, Pierce, Island, San Juan County, WA; due May 22 @ 11 am Changed from May 15 @ 11 am |
|
addendum 2 |
05/14 |
430 Water transmission pipeline reline - Phase 2, Seattle, WA; due May 22 @ 2 pm |
|
addendum 5 |
05/13 |
Sultan River side channel 1 extension, Sultan, WA; due May 16 @ 2 pm |
|
prebids 1 + 2 |
05/13 |
Sultan River side channel 1 extension, Sultan, WA; due May 16 @ 2 pm |
|
addendum 2 |
05/13 |
19th Street and Northwest Cascade Avenue green retrofit and LID facility, East Wenatchee, WA; due May 29 @ 11 am Changed from May 23 @ 11 am |
|
addendum 1 |
05/13 |
Siding and trim replacement at Carriage House Apartments, Building D, SeaTac, WA; due May 16 @ 2 pm |
|
addendum 1 |
05/13 |
Maplewood Heights Elementary fields and grounds upgrades, Renton, WA; due May 15 @ 2 pm |
|
addendum 2 |
05/13 |
Northeast Ribbon Ridge Road bridge maintenance bundle, Yamhill County, OR; due May 15 @ 2 pm |
|
sheet pile typ bent layout |
05/13 |
Pfenning Road sidewalk extension, Ellensburg, WA; due May 14 @ 3 pm |
|
addendum 3 |
05/13 |
3140 Southwest 209th demolition, Beaverton, OR; due May 15 @ 2 pm |
|
addendum 5 |
05/13 |
Parking garage railing replacement at Bell Street - BES, King County, WA; due Jun 11 @ 2 pm |
|
prebid agenda |
05/13 |
Apartment sound insulation, King County, WA; due Jun 6 @ 2 pm |
|
prebid record |
05/13 |
Apartment sound insulation, King County, WA; due Jun 6 @ 2 pm |
|
qa 2 |
05/13 |
Fairhaven Marine Industrial Park (FMIP) improvements - Phase 1, Bellingham, WA; due May 23 @ 11 am |
|
addendum 2 |
05/13 |
SR 302, Victor Creek - Remove fish barriers, Mason County, WA; due May 30 @ 11 am Changed from May 22 @ 11 am |
|
addendum 5 |
05/13 |
Hinsdale lab additions construction services, Corvallis, OR; due May 23 @ 2 pm |
|
addendum 1 |
05/13 |
2024 Port-wide paving, Longview, WA; due May 21 @ 10 am |
|
addendum 1 |
05/13 |
42nd Avenue upgrade - Phase 1 Lake Otis Parkway to Pipe Street, Anchorage, AK; due May 17 @ 2 pm |
|
addendum 1 |
05/13 |
Melcher Street pump station rehabilitation, Port Orchard, WA; due Cancelled Changed from May 16 @ 1 pm |
|
addendum 6 |
05/13 |
US 395 and I-90, NSC 2024 Demo No. 1, Spokane County, WA; due May 15 @ 11 am |
|
qa 1 |
05/13 |
F Lot electrical service upgrades, Olympia, WA; due May 29 @ 2 pm Changed from May 28 @ 2 pm |
|
addendum 1 |
05/13 |
Performing arts center renovation, Mukilteo, WA; due May 21 @ 2 pm |
|
addendum 2 |
05/13 |
HVAC, Phase 2, Ag Science, University of Idaho, Moscow, ID; due May 23 @ 2 pm Changed from May 16 @ 2 pm |
|
addendum 4 |
05/13 |
2024 North phase of waterline improvements, Goldendale, WA; due May 15 @ 2 pm |
|
addendum 1 |
05/13 |
Fones Road, Olympia, WA; due May 14 @ 10 am |
|
addendum 2 |
05/13 |
Haddon Park renovation, Bremerton, WA; due May 24 @ 1 pm |
|
addendum 1 |
05/13 |
Kitsap Lake Park renovation, Bremerton, WA; due May 24 @ 1:30 pm |
|
addendum 1 |
05/13 |
Raab Park play for all, Poulsbo, WA; due May 28 @ 11 am Changed from May 14 @ 11 am |
|
addendum 1 |
05/13 |
Briarwood, Cedar Trails, and Newcastle elementary schools water damage repairs, King County, WA; due May 21 @ 10 am |
|
addendum 1 |
05/13 |
Science lab alterations, Pasco, WA; due May 22 @ 1 pm |
|
addendum 1 |
05/13 |
Crescent Harbor Elementary School, Oak Harbor, WA; due Jun 4 @ 3 pm Changed from May 21 @ 2 pm |
|
addendum 3 |
05/13 |
Maintenance building expansion, Spokane County, WA; due May 23 @ 4 pm |
|
addendum 1 |
05/13 |
Student service center remodel, Walla Walla, WA; due May 23 @ 1 pm |
|
addendum 1 |
05/13 |
Washington Network for Innovative Careers (WANIC) nursing lab, Kirkland, WA; due May 14 @ 1 pm |
|
addendum 2 |
05/13 |
Runway repair patch grooving, Snohomish County, WA; due May 15 @ 11 am |
|
addendum 1 |
05/13 |
Sultan River side channel 1 extension, Sultan, WA; due May 16 @ 2 pm |
|
addendum 1 |
05/13 |
Building 32, US Mower paving, Skagit County, WA; due May 30 @ 2:30 pm |
|
addendum 1 |
05/13 |
Renovation for I-Grad program, Kent, WA; due May 23 @ 2 pm |
|
addendum 1 |
05/13 |
Northeast 92nd Avenue pump station, Battle Ground, WA; due May 15 @ 10 am |
|
addendum 2 |
05/10 |
Kentridge D-Wing Art remodel, Kent, WA; due May 22 @ 2 pm |
|
addendum 2 |
05/10 |
Duvall Slough bridge No. 1136B - Re-deck, King County, WA; due May 14 @ 1:30 pm |
|
clarification 4 |
05/10 |
Southeast Eagle Creek Road Pump Station improvements, Estacada, OR; due May 16 @ 2 pm |
|
addendum 2 |
05/10 |
Eighth Avenue Northwest, Puyallup, WA; due May 15 @ 2 pm |
|
addendum 1 |
05/10 |
Lake Sylvia State Park - Culvert replacement, Montesano, WA; due May 16 @ 1 pm |
|
addendum 1 |
05/10 |
West Point Treatment Plant (WPTP) raw sewage pumps (RSP) and grit classifier replacement, King County, WA; due May 16 @ 1:30 pm |
|
clarification 7 |
05/10 |
Whiteman Cove fish passage restoration, Longbranch, WA; due May 13 @ 12 pm |
|
addendum 6 |
05/10 |
West Point Treatment Plant (WPTP) raw sewage pumps (RSP) and grit classifier replacement, King County, WA; due May 16 @ 1:30 pm Changed from May 14 @ 1:30 pm |
|
addendum 11 |
05/10 |
50th Avenue roundabout and Pioneer Street widening, Ridgefield, WA; due May 30 @ 4 pm |
|
addendum 1 |
05/10 |
Wellpinit Boys and Girls Club remodel, Wellpinit, WA; due May 21 @ 2 pm Changed from May 16 @ 2 pm |
|
addendum 3 |
05/10 |
Pfenning Road sidewalk extension, Ellensburg, WA; due May 14 @ 3 pm |
|
addendum 2 |
05/10 |
MV Tokitae drydocking, ; due May 30 @ 11 am |
|
addendum 3 |
05/10 |
Fones Road, Olympia, WA; due May 14 @ 10 am |
|
addendum 1 |
05/10 |
3140 Southwest 209th demolition, Beaverton, OR; due May 15 @ 2 pm |
|
addendum 4 |
05/10 |
JM Brockey roof re-cover/heavy duty diesel roof re-cover, Seattle, WA; due May 16 @ 1 pm |
|
addendum 1 |
05/10 |
Industrial wastewater secondary treatment, Morrow County, OR; due Jun 11 @ 2 pm |
|
addendum 5 |
05/10 |
Newport unit, Central Coast relocation, Newport, OR; due May 16 @ 2 pm Changed from May 14 @ 2 pm |
|
addendum 2 |
05/10 |
Hinsdale lab additions construction services, Corvallis, OR; due May 23 @ 2 pm |
|
prebid sign in |
05/10 |
Ray Williamson Pool improvements, Phase 1, Bainbridge Island, WA; due May 21 @ 2 pm |
|
addendum 1 |
05/10 |
I-84: US197 - The Dalles, Rufus and Arlington Bridges on the Columbia River & The Dalles-California Highway, The Dalles, OR; due May 16 @ 9 am |
|
addendum 4 |
05/09 |
HAPO Center Arena HVAC replacement and installation, Franklin County, WA; due May 22 @ 2 pm Changed from May 15 @ 2 pm |
|
addendum 1 |
05/09 |
Parking Lot E-18 solar canopy, Seattle, WA; due May 15 @ 2 pm |
|
addendum 4 |
05/09 |
I-5, Slater Road interchange roundabout, Whatcom County, WA; due May 15 @ 11 am |
|
qa 5 |
05/09 |
Nisqually State Park - New full service park: Phase 2, Pierce County, WA; due May 16 @ 1 pm |
|
addendum 2 |
05/09 |
Fire Station 55 remodel, Vashon, WA; due Jun 4 @ 2 pm |
|
plan revision |
05/09 |
I-84: US197 - The Dalles, Rufus and Arlington Bridges on the Columbia River & The Dalles-California Highway, The Dalles, OR; due May 16 @ 9 am |
|
addendum 3 |
05/09 |
Campus security upgrades - Access controls, Spokane, WA; due May 29 @ 1 pm |
|
addendum 1 |
05/09 |
Middle Fork Nooksack River Porter Reach Phase 2 restoration, Whatcom County, WA; due May 15 @ 1 pm |
|
addendum 1 |
05/09 |
Millwood Estates - Landscape irrigation - Phase 2, Lynnwood, WA; due May 22 @ 12 pm |
|
prebid sign-in |
05/09 |
Algona Wetland Preserve restoration and interpretive trail, Algona, WA; due May 20 @ 10 am |
|
addendum 1 |
05/09 |
Thompson Creek Road Southeast at Thompson Creek fish passage, Thurston County, WA; due May 16 @ 9 am |
|
informational com 2 |
05/09 |
Nichols Boulevard and Olympia Way pavement restoration, Longview, WA; due May 14 @ 2:30 pm |
|
addendum 1 |
05/09 |
Middle Pilchuck habitat restoration, Snohomish County, WA; due May 14 @ 11 am |
|
addendum 1 |
05/09 |
2024 Citywide Otta seal, Raymond, WA; due May 16 @ 10 am |
|
addendum 5 |
05/09 |
Lift Station No. 5 design retrofit, Tukwila, WA; due May 16 @ 9:30 am |
|
addendum 1 |
05/09 |
Discovery corridor wastewater transmission system: Phase 2A capital improvement program, Clark County, WA; due May 16 @ 10 am |
|
addendum 2 |
05/09 |
City Hall addition and modernization - Rebid, Buckley, WA; due May 14 @ 2 pm |
|
addendum 2 |
05/09 |
Sunset, Meinecke, and Timbrel grind and inlay, Sherwood, OR; due May 16 @ 2 pm |
|
addendum 1 |
05/09 |
District-wide renovations - CM/GC services, Curry County, OR; due May 16 @ 2 pm |
|
addendum 2 |
05/09 |
Bogachiel Way overlay, Forks, WA; due May 9 @ 1 pm |
|
addendum 4 |
05/09 |
Electrical infrastructure, Tacoma, WA; due May 16 @ 1 pm |
|
addendum 1 |
05/09 |
I-82 and I-84: Umatilla - Pendleton concrete pavement repair on the McNary and Old Oregon Trail Highway, Umatilla, OR; due May 16 @ 9 am |
|
addendum 1 |
05/09 |
Columbia Way substation addition, Longview, WA; due May 15 @ 2 pm |
|
addendum 1 |
05/09 |
I-5, Slater Road interchange roundabout, Whatcom County, WA; due May 15 @ 11 am |
|
qa 4 |
05/09 |
Cascadia Gateway CC5 Building - General contractor/construction manager, Bothell, WA; due May 13 @ 2 pm |
|
addendum 3 |
05/09 |
2024 Street improvement, Happy Valley, OR; due May 9 @ 2 pm |
|
addendum 2 |
05/09 |
Septic system elimination program at Meadow Ridge Elementary School, Mead, WA; due May 15 @ 2 pm Changed from May 10 @ 2 pm |
|
addendum 2 |
05/08 |
2024 Water main replacement and overlay, Oak Harbor, WA; due May 14 @ 2 pm |
|
addendum 1 |
05/08 |
West Point Treatment Plant (WPTP) raw sewage pumps (RSP) and grit classifier replacement, King County, WA; due May 16 @ 1:30 pm |
|
addendum 10 |
05/08 |
Webb Avenue pump station improvements, Arch Cape, OR; due May 15 @ 2 pm |
|
addendum 2 |
05/08 |
2024 Citywide otta seal, Oakville, WA; due May 17 @ 2 pm |
|
addendum 2 |
05/08 |
WWVH - Maintenance and storage building, ; due May 14 @ 1 pm |
|
addendum 3 |
05/08 |
Taxiway A extension, Roseburg, WA; due May 16 @ 2 pm |
|
addendum 1 |
05/08 |
Fire and domestic water pump renovation, Olympia, WA; due May 23 @ 2 pm |
|
revised specs |
05/08 |
Thompson Creek Road Southeast at Thompson Creek fish passage, Thurston County, WA; due May 16 @ 9 am |
|
informational com 1 |
05/08 |
2024 Maintenance overlay, Issaquah, WA; due May 9 @ 2 pm |
|
addendum 3 |
05/08 |
Replace RTU air handlers, College of Technology, ISU, Pocatello, ID; due May 15 @ 11 am Changed from May 8 @ 11 am |
|
addendum 2 |
05/08 |
I-84, SR 14 Interchange vicinity - Plymouth Weigh Station improvements, Benton County, WA; due Jun 26 @ 11 am |
|
addendum 1 |
05/08 |
Washington Network for Innovative Careers (WANIC) nursing lab, Kirkland, WA; due May 14 @ 1 pm |
|
addendum 1 |
05/08 |
Nevada Drive force main replacement, Cowlitz County, WA; due May 16 @ 10 am |
|
addendum 1 |
05/08 |
Ridgefield treatment plant secondary treatment process improvements, Ridgefield, WA; due May 30 @ 10 am |
|
addendum 1 |
05/08 |
Building 68 technical equipment center replacement at the Applied Process Engineering Lab (APEL) Building, Richland, WA; due May 15 @ 1 pm |
|
addendum 1 |
05/08 |
SR 7, Pacific Highway crossing and signalization, Pierce County, WA; due May 15 @ 11 am |
|
addendum 1 |
05/08 |
2024 Pavement and pedestrian improvements, Sedro-Woolley, WA; due May 14 @ 2 pm |
|
prebid docs |
05/08 |
Woll Road resurfacing and widening, North Pole, AK; due May 14 @ 2 pm |
|
addendum 1 |
05/08 |
2024 Street improvement, Happy Valley, OR; due May 9 @ 2 pm |
|
addendum 1 |
05/08 |
|